Export, engineered as carefully as the product

We ship 2,400+ transformers a year to utilities, EPC contractors and distributors in 60+ countries. Here is exactly how the process works.

Export Process

From RFQ to energized site in 6 steps

RFQ & technical clarification

Send kVA, voltage ratio, vector group, standard. Quotation + outline drawing within 24 hours.

Contract & advance payment

Proforma invoice, 30% T/T advance or irrevocable L/C at sight. Production slot reserved.

Manufacturing & routine test

25–45 days typical lead time. Witnessed routine tests and SGS/BV/TÜV inspection available.

Export packaging

Seaworthy fumigation-free cases, nitrogen-capped oil drums, shock & tilt indicators fitted.

Ocean freight & documents

FOB Shanghai/Ningbo, CIF or DDP. Full set: B/L, CO, packing list, test reports, insurance.

Site support & warranty

Supervision engineers on request, 24-month warranty, spare parts dispatched in 7 days.

Trade Terms

Incoterms we work with daily

EXW

Ex Works — you arrange pickup at our Jiangsu factory

FOB

Free On Board — delivered onto vessel at Shanghai or Ningbo port

CIF

Cost, Insurance & Freight — landed at your destination port

DDP

Delivered Duty Paid — door to door, we handle customs

Payment

Payment methods

T/T Telegraphic Transfer

30% advance, 70% against B/L copy. Standard for repeat partners.

Irrevocable L/C at sight

Accepted from first-class banks for utility and government tenders.

CAD / Documents against payment

Available for selected markets after credit review.

Market Access

Certifications by destination market

Middle East & GCC
IEC 60076 · SASO conformity · SEC/DEWA type approvals on request
Africa
IEC 60076 · SONCAP (Nigeria) · KEBS (Kenya) · COC pre-shipment inspection
Southeast Asia
IEC 60076 · TNB/PLN/EGAT utility specifications · SIRIM support
Europe
CE · EN 60076 · Ecodesign Tier 2 (EU 548/2014) · KEMA type test reports
Americas
IEEE/ANSI C57 · CSA support · NOM for Mexico on request
Central Asia & CIS
GOST-R / EAC conformity · GOST 11677 builds
IEC 60076ISO 9001ISO 14001CEKEMA Type TestSGS VerifiedIEEE C57Ecodesign Tier 2

FAQ

Questions buyers ask before the first container

What is your typical lead time?+

25–35 days for distribution transformers, 45–70 days for power transformers above 10MVA, depending on specification and test schedule.

Which HS codes apply to transformers?+

8504.21 (≤650kVA), 8504.22 (650kVA–10MVA) and 8504.23 (>10MVA) under HS chapter 85. We provide full customs documentation.

Can we witness the routine tests?+

Yes — your inspector or a third party (SGS, BV, TÜV, Intertek) can witness the complete IEC routine test sequence at our 220kV test bay.

How are transformers protected during ocean freight?+

Units ship oil-filled (sealed) or nitrogen-capped, bolted to steel skids in fumigation-free wooden cases with shock and tilt recorders. Desiccant breathers and VCI protection included.

What warranty do you offer overseas?+

24 months from commissioning or 30 months from delivery, whichever comes first, with spare parts dispatched within 7 days by air.

Do you provide installation supervision?+

Yes. Commissioning engineers are available worldwide; travel and daily rates are quoted with your order.

Send your specification. Get a quote in 24 hours.

Share your kVA rating, voltage ratio and standard — our engineers reply with price, drawings and lead time.